Company History

Company History
1974: | “Lucky Cement Corporation” was established on May 7 1974. |
1979: | Dongao Plant was commenced civil construction. |
1981: | The first cement production line in Dongao Plant was completed in operation and its annual production capacity was 600,000 tons. |
1983: | The second cement production line was commenced in Dongao Plant. |
1985: | The second cement production line in Dongao Plant was completed in operation and its annual production capacity was 800,000 tons. |
1986: | Renovated the first cement production line in Dongao Plant and its annual production capacity was increased to 800,000 tons. |
1987: |
Invested in Dasheng Building Enterprise Co., Ltd. Invested in establishment of Lucky Cement Corp., Japan. |
1989: | Dasheng Building Enterprise Co., Ltd. was renamed to Dasheng Enterprise Co., Ltd. |
1990 |
Class A stock IPO. Nankang Storage & Transportation Station was completed for operation. |
1991: | Taichung Storage & Transportation Station was completed for operation, promoting delivery capacity of cement for the central Taiwan. |
1992: | Acquired the land, plant and equipment of Puxin Cement Plant of Yungkang Industrial Co., with which the cement annual production capacity was 200,000 tons. |
1993: |
Technical renovated the first cement production line of Dongao Plant and annual production capacity was increased to 1 million tons. Established Luckyship Marine Co., Ltd Established Luckicon Ready-mixed Concrete Factory Co., Ltd |
1994: | The third cement grinding system in Puxin Plant completed construction at the end of year and annual production capacity was increased to 1.4 million tons. |
1995: |
The first rotary kiln equipment of Dongao plant was improved, and clinker annual production capacity was increased to 1.2 million tons. At this point, two cement rotary kiln equipments in the Companys Dongao plant had clinker annual production capacity was 2 million tons; Dongao plant and Puxin plant had a total grinding production capacity of cement was 3 million tons. Taichung storage & transportation station add a cement silo to improve additional cement delivery capacity to the Central Taiwan. Phase 1 expansion construction of Horen mining began, which was used to reinforce quality of developed mining source. Puxin Plant researched and developed slag powder product and promote to customers. Established Luckyship Navigation S.A. Established Luckipar Professional Basketball Co., Ltd |
1996: |
Dongao & Puxin Plants ISO9002. certified |
1997: |
Phase 1 expansion construction of Horen mining completed (limestone transport and crushing equipment). Dongao Plant production rationalization project completed |
1998: | Puxin Plant additional slag powder production equipment completed, with which increase annual production capacity to 300,000 tons. |
1999: | The production equipment of fly ash in Puxin Plant was completed, with which annual production capacity was 260,000 tons. |
2000: | Added waste disposal projects to increase operating revenue. |
Established Just Bright(BVI)Co. Established Hojen Harbour Development Co., Ltd. |
|
2001: | Established Changxin photoelectric Co., Ltd.(renamed to ELUMINA Technology Inc.). |
2002: |
Kaohsiung Storage & Transportation Station was completed for operation, promoting cement delivery capacity for the Southern Taiwan. Luckipar Professional Basketball Co., Ltd was dismissed for liquidation. |
2003: |
Wudu Storage & Transportation Station was completed that replace Nankang Storage & Transportation Station to be the Delivery Center for Northern Taiwan. Luckyship Navigation S.A. was dismissed for liquidation. |
2004: | Phase 2 expansion construction of Horen mining began, with which to increase mining source and develop a variety of limestone products for incremental sales revenue. |
2006: |
Stone product was firstly available on the market. Luckyship Marine Co., Ltd purchased a vessel from its affiliated Company named Luckyship Navigation S.A. |
2007: |
The second rotary kiln in Dongao Plant was renovated to reduce the production cost. Established Fuyu Development Company to explore and deliver a variety of limestone products. |
2008: |
Phase 2 expansion construction of Horen mining completed. The Company passed Quality Certification of ISO9001:2008. |
2012: | Luckyship Navigation S.A. concluded in the liquidation. |
2015: |
Luckyship Marine Co., Ltd purchased a vessel ELUMINA (Xiamen) Technology Inc., the subsidiary of ELUMINA Technology Inc., conducts dissolution and liquidation procedures |
2016: | Hojen Harbour Development Co., Ltd. proceeded in dismissal and liquidation in September 2016. |
2018: | Elumina Technology Inc. was granted dissolution registration on November 8, 2018. |
2019 | The board of directors decided to end the operation of Just Bright Ltd (BVI) on December 27, 2019. |
2021 | Just Bright Ltd (BVI) concluded in the liquidation. |
2024 |
The board of directors decided to end the operation of Lucky Cement Corp., Japan. on Mar. 15, 2024. Lucky Cement Corp., Japan. concluded in the liquidation. |